Northern Hospital Epping

Published 12th February 2024

The Northern Hospital IPU expansion project was undertaken across two stages. Stage 1 consisted of ground level entry, level 1 IPU and ICU. The building was then occupied whilst Stage 2 was designed which included a loading dock, theatre suite, CSSD and 5 levels of IPU tower.

We undertook the full design documentation and construction phase services for both stages. The disciplines included Mechanical, Electrical, Fire Protection, Hydraulic and Vertical Transportation Engineering services.

LinkedIn
Australia