Customize Consent Preferences

We use cookies to help you navigate efficiently and perform certain functions. You will find detailed information about all cookies under each consent category below.

The cookies that are categorized as "Necessary" are stored on your browser as they are essential for enabling the basic functionalities of the site. ... 

Always Active

Necessary cookies are required to enable the basic features of this site, such as providing secure log-in or adjusting your consent preferences. These cookies do not store any personally identifiable data.

No cookies to display.

Functional cookies help perform certain functionalities like sharing the content of the website on social media platforms, collecting feedback, and other third-party features.

No cookies to display.

Analytical cookies are used to understand how visitors interact with the website. These cookies help provide information on metrics such as the number of visitors, bounce rate, traffic source, etc.

No cookies to display.

Performance cookies are used to understand and analyze the key performance indexes of the website which helps in delivering a better user experience for the visitors.

No cookies to display.

Advertisement cookies are used to provide visitors with customized advertisements based on the pages you visited previously and to analyze the effectiveness of the ad campaigns.

No cookies to display.

Wyckham Bypass Extension Bridge

Published 30th August 2022

Waterman Moylan provided design and construction administration services in connection with two road crossings over the new LUAS tram line at Balally, Dundrum.

The bridge works were part of a large mixed-use development at the site and were designed as integral structures to eliminate the need for bearings and movement joints, and thus the maintenance requirements that accompany these.

The new structures were formed from precast super TY beams with structural concrete toppings which sat on in-situ concrete abutment walls and 600 mm diameter CFA piles.

As Wyckham Bridge straddled a trunk water main, both abutments were designed to span a 10 m zone centred on the water main.
The simple form of the integral bridge design led to a very rapid construction period of five months, allowing all works to be completed ahead of the LUAS contractor taking possession of the cutting along which the track runs.

The project also included the extension of the Wyckham Bypass through the site which comprised the construction of a bus drop-off terminus at the new LUAS station and extensive modification to the very busy Sandyford Road/Wyckham Bypass. A combination of reinforced soil slopes, reinforced earth walls and in-situ reinforced concrete retaining walls was adopted to provide stability to the sides of the rail cutting through the site.

Client: Gannon Properties